Depreciation on a property built in 2009

A residential building whose construction began in 2009 is deducted at 2.5% of its construction cost a year, for construction begun after 15 September 1987. Counting from 30 June 2009, its 40 years run from the 2009–10 income year to 2048–49, and from 2026–27 it has 23 income years left. Our national series puts new houses at $1,048 per m² of floor area in the year to 30 June 2009, 6% up on 2008's $987.

Rate
2.5%
Years left
23
Last year
2048–49

What a house built in 2009 cost, state by state

A standard 200 m² single-storey brick veneer house at 2009 rates, less the builder's plant (3.6% of its cost that year), listed separately; the deduction is 2.5% of it a year.

Construction cost and capital works deduction of a 200 m² house built in 2009, by state
StateRate per m² in 2009Construction costDeduction a yearLeft to claim
New South Wales$1,099
$198,594
$4,965$114,195
Victoria$1,057
$191,134
$4,778$109,894
Queensland$1,035
$187,035
$4,676$107,548
Western Australia$869
$156,995
$3,925$90,275
South Australia$809
$146,260
$3,657$84,111
Tasmania$1,116
$201,718
$5,043$115,989
Australian Capital Territory$1,154
$208,531
$5,213$119,899
Northern Territory$1,743
$315,038
$7,876$181,148

Indicative. "Left to claim" is the deduction a year times the 23 income years left; the first and last are usually part years.

The cost per m² around 2009

From 2008 to 2009 the standard house's rate per m² rose 2%, from $1,014 to $1,038: the 28th steepest of the 40 year-on-year changes since 1985. In 2010 it rose 4% again, to $1,076. At 2025's rates it costs $347,938 to build, 1.9 times its 2009 cost of $187,675, and the deduction is worked from the 2009 figure.

The standard house's rate per m² and cost before any state's factor, 2007 to 2011
YearRate per m²On the year before200 m² house
2007$960+3.0%$172,540
2008$1,014+5.6%$182,782
2009$1,038+2.4%$187,675
2010$1,076+3.7%$194,387
2011$1,106+2.8%$199,886

Building in 2009, nationally

The ABS measure: the value of new houses built (land excluded) over their floor area, so it follows the kind of house as well as prices, and its 2009 is the year to 30 June 2009.

The rate per m²

Our national series puts new houses in the year to 30 June 2009 at $1,048 per m² of floor area, 6% up on 2008's $987 and 92% up over the ten years from 1999's $545.

The average new house

We put the average new house of 2009 at 246.8 m² of floor area, the ABS's 2009 figure: at 2009's $1,048 per m², it cost about $259,000 to build.

How the figure was reached

How 2009's figure was arrived at: a per-m² figure a third party derived from the ABS averages for the year; not an ABS-published rate. It rests on 1 source and is graded B, from A (a published figure) to D (an assumed rate of growth).

2009 in Division 43's history

  • Counting the calendar year each began in as its first, 2009 is the 25th year of capital works for homes (from 18 July 1985), the 23rd year of the rate of 2.5% over 40 years (from 16 September 1987) and the 18th year of structural improvements' claims (from 27 February 1992).
  • 2009 came 8 years before section 40-27 on second-hand plant (from 7.30 pm on 9 May 2017).

Where it stands in 2026–27

2026–27 is the 18th of its 40 income years at 2.5%. 23 income years, this one counted, carry 57.5% of its construction cost; the 42.5% of the 17 years before is spent, whoever owned it then. The first half of its years ends with 2028–29.

A kitchen replaced ten years on, in 2019, is new capital works with 40 years of its own, claimed until 2059: 10 years past 2009's own last income year, 2048–49. Every renovation since 2009 is the same, whatever the house's own date; its invoices and photos date it.

Renovating a rental built in 2009: the old plant and works Houses of 2000 to 2009 beside the other years Using a previous owner's schedule

A standard house's plant, fitted new in 2009

In 2009 the builder's plant was about 3.6% of a standard house's cost, listed apart from the building; plant prices stood at 88% of 2020's by our plant index, and the ABS house construction price index for Australia stood at 78% of its June quarter 2020 level in the June quarter 2009. Fitted in 2009, with each life counted from 30 June 2009 as the building's years are, all 6 below have passed their effective lives, the last in 2020–21; a replacement bought new for a let property starts its own.

Plant new in 2009: its price, effective life and the income year that life ends in
ItemInstalled new, 2009 pricesEffective lifeLife ends, income year
Oven$1,39412 years2020–21
Cooktop$54912 years2020–21
Dishwasher$9298 years2016–17
Electric hot water system$1,26312 years2020–21
Carpet$3,3108 years2016–17
Blinds$1,26310 years2018–19

Common questions

How much depreciation can I claim on a house built in 2009?

On a 2009 building, 2.5% of what it cost to construct, each year until 2048–49. For a standard 200 m² brick veneer house that is about $4,965 a year in New South Wales, $4,778 in Victoria and $4,676 in Queensland, with 23 income years left. Plant new to you adds to that, as does any renovation since 2009.

I bought a 2009 property second-hand. Does the deduction start again?

No: a 2009 building's 40 years run from its completion, not from your purchase, so a buyer claims the 23 income years left, 2026–27 to 2048–49, on the original construction cost rather than the price paid. Fitted new in 2009, 167 of the 181 kinds of plant our catalogue prices have passed their effective lives, and the other 14 end from 2028–29 to 2038–39. Section 40-27 reaches plant acquired from 7.30 pm on 9 May 2017, when a 2009 house was 8 years old or so: bought from an earlier owner since then, the plant that came with a 2009 house is generally not deductible (the 2017 rules set out who it reaches and the exceptions).

What was the rate for 2009?

2.5% a year over 40 years, for construction begun after 15 September 1987: counting from 30 June 2009, the 2009–10 to 2048–49 income years. Construction begun on any day of 2009 qualifies, the window having opened on 16 September 1987, and 17 of its 40 income years have passed.

What did it cost to build a house in 2009?

In the year to 30 June 2009, our national series puts new houses at $1,048 per m² of floor area, 92% up over the ten years from 1999's $545, and the average new house, about 247 m², cost about $259,000 to build. At 2009's rates, our standard 200 m² single-storey brick veneer house, less the plant listed separately, cost about $187,675 at the national rate, against $182,782 in 2008 and $194,387 in 2010. In 2009 it was cheapest in South Australia, at $146,260, and dearest in the Northern Territory, at $315,038. Where the 2009 build's own cost is not documented, a schedule estimates it at 2009's rates, about $187,675 for that house nationally, by an appropriately qualified person, as Taxation Ruling TR 97/25 accepts.

General information only, not advice about your circumstances. Speak to a registered tax agent before relying on it.