2000 to 2009
Depreciation on a property built in 2004
A residential building whose construction began in 2004 is deducted at 2.5% of its construction cost a year, for construction begun after 15 September 1987. Counting from 30 June 2004, its 40 years run from the 2004–05 income year to 2043–44, and from 2026–27 it has 18 income years left. Our national series puts new houses at $761 per m² of floor area in the year to 30 June 2004, 8% up on 2003's $704.
- Rate
- 2.5%
- Years left
- 18
- Last year
- 2043–44
What a house built in 2004 cost, state by state
A standard 200 m² single-storey brick veneer house at 2004 rates, less the builder's plant (4.8% of its cost that year), listed separately; the deduction is 2.5% of it a year.
| State | Rate per m² in 2004 | Construction cost | Deduction a year | Left to claim |
|---|---|---|---|---|
| New South Wales | $943 | $168,266 | $4,207 | $75,726 |
| Victoria | $946 | $168,804 | $4,220 | $75,960 |
| Queensland | $821 | $146,571 | $3,664 | $65,952 |
| Western Australia | $578 | $103,073 | $2,577 | $46,386 |
| South Australia | $681 | $121,566 | $3,039 | $54,702 |
| Tasmania | $879 | $156,821 | $3,921 | $70,578 |
| Australian Capital Territory | $977 | $174,409 | $4,360 | $78,480 |
| Northern Territory | $1,148 | $204,906 | $5,123 | $92,214 |
Indicative. "Left to claim" is the deduction a year times the 18 income years left; the first and last are usually part years.
The cost per m² around 2004
From 2003 to 2004 the standard house's rate per m² rose 6%, from $804 to $853: the 8th steepest of the 40 year-on-year changes since 1985. In 2005 it rose 6% again, to $901. At 2025's rates it costs $347,938 to build, 2.3 times its 2004 cost of $152,165, and the deduction is worked from the 2004 figure.
Building in 2004, nationally
The ABS measure: the value of new houses built (land excluded) over their floor area, so it follows the kind of house as well as prices, and its 2004 is the year to 30 June 2004.
The rate per m²
Our national series puts new houses in the year to 30 June 2004 at $761 per m² of floor area, 8% up on 2003's $704 and 50% up over the ten years from 1994's $508.
The average new house
We put the average new house of 2004 at 234.3 m² of floor area, the ABS's 2004 figure: at 2004's $761 per m², it cost about $178,000 to build.
How the figure was reached
How 2004's figure was arrived at: the published ABS average cost over the published average floor area. It rests on 4 sources and is graded A, from A (a published figure) to D (an assumed rate of growth).
2004 in Division 43's history
- Counting the calendar year each began in as its first, 2004 is the 20th year of capital works for homes (from 18 July 1985), the 18th year of the rate of 2.5% over 40 years (from 16 September 1987) and the 13th year of structural improvements' claims (from 27 February 1992).
- 2004 came 13 years before section 40-27 on second-hand plant (from 7.30 pm on 9 May 2017).
Where it stands in 2026–27
2026–27 is the 23rd of its 40 income years at 2.5%. 18 income years, this one counted, carry 45% of its construction cost; the 55% of the 22 years before is spent, whoever owned it then. The first half of its years ended with 2023–24.
A kitchen replaced ten years on, in 2014, is new capital works with 40 years of its own, claimed until 2054: 10 years past 2004's own last income year, 2043–44. Every renovation since 2004 is the same, whatever the house's own date; its invoices and photos date it.
Renovating a rental built in 2004: the old plant and works Houses of 2000 to 2009 beside the other years Using a previous owner's scheduleA standard house's plant, fitted new in 2004
In 2004 the builder's plant was about 4.8% of a standard house's cost, listed apart from the building; plant prices stood at 80% of 2020's by our plant index, and the ABS house construction price index for Australia stood at 64% of its June quarter 2020 level in the June quarter 2004. Fitted in 2004, with each life counted from 30 June 2004 as the building's years are, all 6 below have passed their effective lives, the last in 2015–16; a replacement bought new for a let property starts its own.
| Item | Installed new, 2004 prices | Effective life | Life ends, income year |
|---|---|---|---|
| Oven | $1,274 | 12 years | 2015–16 |
| Cooktop | $502 | 12 years | 2015–16 |
| Dishwasher | $849 | 8 years | 2011–12 |
| Electric hot water system | $1,154 | 12 years | 2015–16 |
| Carpet | $3,025 | 8 years | 2011–12 |
| Blinds | $1,154 | 10 years | 2013–14 |
Common questions
How much depreciation can I claim on a house built in 2004?
On a 2004 building, 2.5% of what it cost to construct, each year until 2043–44. For a standard 200 m² brick veneer house that is about $4,207 a year in New South Wales, $4,220 in Victoria and $3,664 in Queensland, with 18 income years left. Plant new to you adds to that, as does any renovation since 2004.
I bought a 2004 property second-hand. Does the deduction start again?
No: a 2004 building's 40 years run from its completion, not from your purchase, so a buyer claims the 18 income years left, 2026–27 to 2043–44, on the original construction cost rather than the price paid. Fitted new in 2004, 177 of the 181 kinds of plant our catalogue prices have passed their effective lives, and the other 4 end from 2028–29 to 2033–34. Section 40-27 reaches plant acquired from 7.30 pm on 9 May 2017, when a 2004 house was 13 years old or so: bought from an earlier owner since then, the plant that came with a 2004 house is generally not deductible (the 2017 rules set out who it reaches and the exceptions).
What was the rate for 2004?
2.5% a year over 40 years, for construction begun after 15 September 1987: counting from 30 June 2004, the 2004–05 to 2043–44 income years. Construction begun on any day of 2004 qualifies, the window having opened on 16 September 1987, and 22 of its 40 income years have passed.
What did it cost to build a house in 2004?
In the year to 30 June 2004, our national series puts new houses at $761 per m² of floor area, 50% up over the ten years from 1994's $508, and the average new house, about 234 m², cost about $178,000 to build. At 2004's rates, our standard 200 m² single-storey brick veneer house, less the plant listed separately, cost about $152,165 at the national rate, against $142,698 in 2003 and $161,464 in 2005. In 2004 it was cheapest in Western Australia, at $103,073, and dearest in the Northern Territory, at $204,906. Where the 2004 build's own cost is not documented, a schedule estimates it at 2004's rates, about $152,165 for that house nationally, by an appropriately qualified person, as Taxation Ruling TR 97/25 accepts.
General information only, not advice about your circumstances. Speak to a registered tax agent before relying on it.