Depreciation on a property built in 1993

A residential building whose construction began in 1993 is deducted at 2.5% of its construction cost a year, for construction begun after 15 September 1987. Counting from 30 June 1993, its 40 years run from the 1993–94 income year to 2032–33, and from 2026–27 it has 7 income years left. Our national series puts new houses at $484 per m² of floor area in the year to 30 June 1993, 5% up on 1992's $460.

Rate
2.5%
Years left
7
Last year
2032–33

What a house built in 1993 cost, state by state

A standard 200 m² single-storey brick veneer house at 1993 rates, less the builder's plant (7.8% of its cost that year), listed separately; the deduction is 2.5% of it a year.

Construction cost and capital works deduction of a 200 m² house built in 1993, by state
StateRate per m² in 1993Construction costDeduction a yearLeft to claim
New South Wales$640
$110,475
$2,762$19,334
Victoria$618
$106,773
$2,669$18,683
Queensland$543
$93,702
$2,343$16,401
Western Australia$364
$62,820
$1,571$10,997
South Australia$425
$73,338
$1,833$12,831
Tasmania$577
$99,543
$2,489$17,423
Australian Capital Territory$689
$118,896
$2,972$20,804
Northern Territory$713
$123,096
$3,077$21,539

Indicative. "Left to claim" is the deduction a year times the 7 income years left; the first and last are usually part years.

The cost per m² around 1993

From 1992 to 1993 the standard house's rate per m² rose 1%, from $559 to $565: the 33rd steepest of the 40 year-on-year changes since 1985. In 1994 it rose 3% again, to $582. At 2025's rates it costs $347,938 to build, 3.6 times its 1993 cost of $97,603, and the deduction is worked from the 1993 figure.

The standard house's rate per m² and cost before any state's factor, 1991 to 1995
YearRate per m²On the year before200 m² house
1991$559+1.5%$95,969
1992$5590.0%$96,008
1993$565+1.1%$97,603
1994$582+3.0%$100,908
1995$593+1.9%$103,055

Building in 1993, nationally

The ABS measure: the value of new houses built (land excluded) over their floor area, so it follows the kind of house as well as prices, and its 1993 is the year to 30 June 1993.

The rate per m²

Our national series puts new houses in the year to 30 June 1993 at $484 per m² of floor area, 5% up on 1992's $460 and 62% up over the 8 years from 1985's $298, where the series starts.

The average new house

We put the average new house of 1993 at about 193 m² of floor area, read between the ABS figures for 1988 (181 m²) and 1996 (199.6 m²): at 1993's $484 per m², it cost about $93,000 to build.

How the figure was reached

How 1993's figure was arrived at: between the 1988 and 1996 figures, following the ABS input to house construction index. It rests on 1 source and is graded C, from A (a published figure) to D (an assumed rate of growth).

1993 in Division 43's history

  • Structural improvements' claims began 309 days before 1993 did, from 27 February 1992.
  • Counting the calendar year each began in as its first, 1993 is the 9th year of capital works for homes (from 18 July 1985) and the 7th year of the rate of 2.5% over 40 years (from 16 September 1987).
  • 1993 came 24 years before section 40-27 on second-hand plant (from 7.30 pm on 9 May 2017).

Where it stands in 2026–27

2026–27 is the 34th of its 40 income years at 2.5%. 7 income years, this one counted, carry 17.5% of its construction cost; the 82.5% of the 33 years before is spent, whoever owned it then. The first half of its years ended with 2012–13.

A kitchen replaced ten years on, in 2003, is new capital works with 40 years of its own, claimed until 2043: 10 years past 1993's own last income year, 2032–33. Every renovation since 1993 is the same, whatever the house's own date; its invoices and photos date it.

Renovating a rental built in 1993: the old plant and works Houses of 1988 to 1999 beside the other years Using a previous owner's schedule

A standard house's plant, fitted new in 1993

In 1993 the builder's plant was about 7.8% of a standard house's cost, listed apart from the building; plant prices stood at 68% of 2020's by our plant index, and the ABS house construction price index for Australia (before the September quarter 1996, the ABS project home price index for the weighted average of the eight capitals, linked to it over the four quarters to June 1999) stood at 46% of its June quarter 2020 level in the June quarter 1993. Fitted in 1993, with each life counted from 30 June 1993 as the building's years are, all 6 below have passed their effective lives, the last in 2004–05; a replacement bought new for a let property starts its own.

Plant new in 1993: its price, effective life and the income year that life ends in
ItemInstalled new, 1993 pricesEffective lifeLife ends, income year
Oven$1,07912 years2004–05
Cooktop$42512 years2004–05
Dishwasher$7208 years2000–01
Electric hot water system$97812 years2004–05
Carpet$2,5628 years2000–01
Blinds$97810 years2002–03

Common questions

How much depreciation can I claim on a house built in 1993?

On a 1993 building, 2.5% of what it cost to construct, each year until 2032–33. For a standard 200 m² brick veneer house that is about $2,762 a year in New South Wales, $2,669 in Victoria and $2,343 in Queensland, with 7 income years left. Plant new to you adds to that, as does any renovation since 1993.

I bought a 1993 property second-hand. Does the deduction start again?

No: a 1993 building's 40 years run from its completion, not from your purchase, so a buyer claims the 7 income years left, 2026–27 to 2032–33, on the original construction cost rather than the price paid. Fitted new in 1993, every one of the 181 kinds of plant our catalogue prices has passed its effective life, the last ending in 2022–23. Section 40-27 reaches plant acquired from 7.30 pm on 9 May 2017, when a 1993 house was 24 years old or so: bought from an earlier owner since then, the plant that came with a 1993 house is generally not deductible (the 2017 rules set out who it reaches and the exceptions).

What was the rate for 1993?

2.5% a year over 40 years, for construction begun after 15 September 1987: counting from 30 June 1993, the 1993–94 to 2032–33 income years. Construction begun on any day of 1993 qualifies, the window having opened on 16 September 1987, and 33 of its 40 income years have passed. A driveway, fence or retaining wall finished with it in 1993 may have been begun before 27 February 1992, and then claims nothing; begun on or after that day, it claims at 2.5% over 40 years from its own completion.

What did it cost to build a house in 1993?

In the year to 30 June 1993, our national series puts new houses at $484 per m² of floor area, 62% up over the 8 years from 1985's $298, and the average new house, about 193 m², cost about $93,000 to build. At 1993's rates, our standard 200 m² single-storey brick veneer house, less the plant listed separately, cost about $97,603 at the national rate, against $96,008 in 1992 and $100,908 in 1994. In 1993 it was cheapest in Western Australia, at $62,820, and dearest in the Northern Territory, at $123,096. Where the 1993 build's own cost is not documented, a schedule estimates it at 1993's rates, about $97,603 for that house nationally, by an appropriately qualified person, as Taxation Ruling TR 97/25 accepts.