Skip to content

2017 to today

Depreciation on a property built in 2024

A residential building whose construction began in 2024 is deducted at 2.5% of its construction cost a year, for construction begun after 15 September 1987. Counting from 30 June 2024, its 40 years run from the 2024–25 income year to 2063–64, and from 2026–27 it has 38 income years left. Our national series puts new houses at $1,859 per m² of floor area in the year to 30 June 2024, 8% up on 2023's $1,727.

Rate
2.5%
Years left
38
Last year
2063–64

What a house built in 2024 cost, state by state

A standard 200 m² single-storey brick veneer house at 2024 rates, less the builder's plant (2.8% of its cost that year), listed separately; the deduction is 2.5% of it a year.

Construction cost and capital works deduction of a 200 m² house built in 2024, by state
StateRate per m² in 2024Construction costDeduction a yearLeft to claim
New South Wales$2,195
$400,182
$10,005$380,190
Victoria$1,878
$342,396
$8,560$325,280
Queensland$1,915
$349,146
$8,729$331,702
Western Australia$1,725
$314,428
$7,861$298,718
South Australia$1,371
$249,933
$6,248$237,424
Tasmania$2,142
$390,597
$9,765$371,070
Australian Capital Territory$1,974
$359,826
$8,996$341,848
Northern Territory$2,356
$429,529
$10,738$408,044

Indicative. "Left to claim" is the deduction a year times the 38 income years left; the first and last are usually part years.

The cost per m² around 2024

From 2023 to 2024 the standard house's rate per m² rose 4%, from $1,815 to $1,893: the 16th steepest of the 40 year-on-year changes since 1985. In 2025 it rose 0.7% again, to $1,907. At 2025's rates it costs $347,938 to build, 1.0 times its 2024 cost of $345,172, and the deduction is worked from the 2024 figure.

The standard house's rate per m² and cost before any state's factor, 2022 to 2025
YearRate per m²On the year before200 m² house
2022$1,652+17.5%$300,494
2023$1,815+9.9%$329,884
2024$1,893+4.3%$345,172
2025$1,907+0.7%$347,938

Building in 2024, nationally

The ABS measure: the value of new houses built (land excluded) over their floor area, so it follows the kind of house as well as prices, and its 2024 is the year to 30 June 2024.

The rate per m²

Our national series puts new houses in the year to 30 June 2024 at $1,859 per m² of floor area, 8% up on 2023's $1,727 and 52% up over the ten years from 2014's $1,225.

The average new house

We put the average new house of 2024 at about 238 m² of floor area, read between the ABS figures for 2022 (232.3 m²) and 2025 (241.5 m²): at 2024's $1,859 per m², it cost about $443,000 to build.

How the figure was reached

How 2024's figure was arrived at: a published figure of medium or low confidence, blended with the interpolation. It rests on 1 source and is graded B, from A (a published figure) to D (an assumed rate of growth).

2024 in Division 43's history

  • Counting the calendar year each began in as its first, 2024 is the 40th year of capital works for homes (from 18 July 1985), the 38th year of the rate of 2.5% over 40 years (from 16 September 1987), the 33rd year of structural improvements' claims (from 27 February 1992) and the 8th year of section 40-27 on second-hand plant (from 7.30 pm on 9 May 2017).

Where it stands in 2026–27

2026–27 is the 3rd of its 40 income years at 2.5%. 38 income years, this one counted, carry 95% of its construction cost; the 5% of the 2 years before is spent, whoever owned it then. The first half of its years ends with 2043–44.

A kitchen replaced ten years on, in 2034, is new capital works with 40 years of its own, claimed until 2074: 10 years past 2024's own last income year, 2063–64. Every renovation since 2024 is the same, whatever the house's own date; its invoices and photos date it.

Renovating a rental built in 2024: the old plant and works Houses of 2017 to today beside the other years Using a previous owner's schedule

A standard house's plant, fitted new in 2024

In 2024 the builder's plant was about 2.8% of a standard house's cost, listed apart from the building; plant prices stood at 117% of 2020's by our plant index, and the ABS house construction price index for Australia stood at 142% of its June quarter 2020 level in the June quarter 2024. Fitted in 2024, with each life counted from 30 June 2024 as the building's years are, none below has passed its effective life, the first ending in 2031–32; a replacement bought new for a let property starts its own.

Plant new in 2024: its price, effective life and the income year that life ends in
ItemInstalled new, 2024 pricesEffective lifeLife ends, income year
Oven$1,87212 years2035–36
Cooktop$73712 years2035–36
Dishwasher$1,2488 years2031–32
Electric hot water system$1,69712 years2035–36
Carpet$4,4468 years2031–32
Blinds$1,69710 years2033–34

Common questions

How much depreciation can I claim on a house built in 2024?

On a 2024 building, 2.5% of what it cost to construct, each year until 2063–64. For a standard 200 m² brick veneer house that is about $10,005 a year in New South Wales, $8,560 in Victoria and $8,729 in Queensland, with 38 income years left. Plant new to you adds to that, as does any renovation since 2024.

I bought a 2024 property second-hand. Does the deduction start again?

No: a 2024 building's 40 years run from its completion, not from your purchase, so a buyer claims the 38 income years left, 2026–27 to 2063–64, on the original construction cost rather than the price paid. Fitted new in 2024, 2 of the 181 kinds of plant our catalogue prices have passed their effective lives, and the other 179 end from 2026–27 to 2053–54. A 2024 house has only ever been under section 40-27, from 7.30 pm on 9 May 2017: bought from an earlier owner, the plant that came with a 2024 house is generally not deductible (the 2017 rules set out who it reaches and the exceptions). Bought new, nobody having lived in it, its plant is generally deductible as well, provided no earlier owner could deduct for it, unless you live in it before renting it out.

What was the rate for 2024?

2.5% a year over 40 years, for construction begun after 15 September 1987: counting from 30 June 2024, the 2024–25 to 2063–64 income years. Construction begun on any day of 2024 qualifies, the window having opened on 16 September 1987, and 2 of its 40 income years have passed.

What did it cost to build a house in 2024?

In the year to 30 June 2024, our national series puts new houses at $1,859 per m² of floor area, 52% up over the ten years from 2014's $1,225, and the average new house, about 238 m², cost about $443,000 to build. At 2024's rates, our standard 200 m² single-storey brick veneer house, less the plant listed separately, cost about $345,172 at the national rate, against $329,884 in 2023 and $347,938 in 2025. In 2024 it was cheapest in South Australia, at $249,933, and dearest in the Northern Territory, at $429,529. Where the 2024 build's own cost is not documented, a schedule estimates it at 2024's rates, about $345,172 for that house nationally, by an appropriately qualified person, as Taxation Ruling TR 97/25 accepts.

General information only, not advice about your circumstances. Speak to a registered tax agent before relying on it.